The last two days in June 2018 saw the first power generation from two separate first of a kind nuclear plants in China. Taishan 1, a 1650 MWe European Pressurized Reactor (EPR) was connected to the grid at 5:59 pm local time on June 29, 2018. Less than 24 hours later, at 4:48 pm local time, Sanmen 1, a Westinghouse AP1000 rated at 1117 MWe was connected to the grid and began producing power for the …read more

View Entire Article on NuclearStreet.com